Notice that we are constrained by the scarcest resource (with only 1 dryer, you can't beat one load per hour). Even if we had an infinitely fast washer, it wouldn't help at all.
A pipeline is only as fast as its slowest link!
This comment was marked helpful 0 times.
max
Pipelining is the idea of starting the next operation before the previous one completes. This can be used when there is parallelism between the operations. In this example, we have more than one loads of laundry, so clothes can be placed into the washing machine while the previous load is still drying. The latency is limited by the hour it takes to use the dryer.
This comment was marked helpful 0 times.
xiaowend
Notice that in fact, we are constrained by the slowest resource. After the clothes finished washing, they need to wait for drying. The time duration between clothes finishing washing and starting drying becomes longer and longer.
This comment was marked helpful 0 times.
kayvonf
@xiaoend: You said: "The time duration between clothes finishing washing and starting drying becomes longer and longer." This is certainly true in the diagram, but consider where those wet clothes go? If your college dorm is anything like mine was, basically they sit on top of the washers until dryers become available. In essence, you stick the wet clothes in a buffer. (And hope happens to knock the buffer on the floor.)
If the washer keep washing at its peak rate, that pile of clothes waiting to be dried is going to grow and grow. This is because since wet clothes get added faster than clothes get put in the next available drier. At some point you have to stop doing wash, because there's no place to stick new wet clothes, the buffer is full! (So you probably leave them in the washer.) See slide 11 for an example that's a little more computing oriented.
Notice that we are constrained by the scarcest resource (with only 1 dryer, you can't beat one load per hour). Even if we had an infinitely fast washer, it wouldn't help at all.
A pipeline is only as fast as its slowest link!
This comment was marked helpful 0 times.
Pipelining is the idea of starting the next operation before the previous one completes. This can be used when there is parallelism between the operations. In this example, we have more than one loads of laundry, so clothes can be placed into the washing machine while the previous load is still drying. The latency is limited by the hour it takes to use the dryer.
This comment was marked helpful 0 times.
Notice that in fact, we are constrained by the slowest resource. After the clothes finished washing, they need to wait for drying. The time duration between clothes finishing washing and starting drying becomes longer and longer.
This comment was marked helpful 0 times.
@xiaoend: You said: "The time duration between clothes finishing washing and starting drying becomes longer and longer." This is certainly true in the diagram, but consider where those wet clothes go? If your college dorm is anything like mine was, basically they sit on top of the washers until dryers become available. In essence, you stick the wet clothes in a buffer. (And hope happens to knock the buffer on the floor.)
If the washer keep washing at its peak rate, that pile of clothes waiting to be dried is going to grow and grow. This is because since wet clothes get added faster than clothes get put in the next available drier. At some point you have to stop doing wash, because there's no place to stick new wet clothes, the buffer is full! (So you probably leave them in the washer.) See slide 11 for an example that's a little more computing oriented.